ETWC Homepage

East Tennessee Whitewater Club Forum

Back to the forum index
Linear

The Hiwassee Dries will be running until early March (General Discussion)

by Billy Bob @, Oak Ridge, TN, Saturday, October 31, 2015, 16:00 (602 days ago)

TVA is rebuilding the generating units at the Appalachia powerhouse, which means that they will have to spill water at the dam. Repairs are scheduled to be complete March 4, 2016. Water released at the dam will flow through the Dries before flowing down the lower sections of the river.

The "average outflow" value on the Hiwassee RELEASE SCHEDULE page on the ETWC River Gauges page should be a good guide for TVA's plans for release rates - and the water temperature will be warmer than usual!

  729 views

The Hiwassee Dries will be running until early March

by T4eresa, Monday, November 09, 2015, 11:51 (593 days ago) @ Billy Bob

Hi all. I'm in town until the 16th of November and would love to get on this run. I can paddle on weekdays. Call or email if you want to go! 503-479-542six. I haven't run it in 20 years but if I recall correctly it's a solid class IV run with one drop that is often portaged.

  645 views
RSS Feed of thread
6169 Postings in 2210 Threads, 329 registered users, 7 users online (0 registered, 7 guests)
Forum time: 2017-06-24, 20:39
RSS Postings  RSS Threads | Contact
powered by my little forum